The ceilings table, the stale-reference line and the metadata-integrity
paragraph all described the audit-time state as current. Each now says what was
found and what changed: the catalog ceiling is 53/64 = 83% (l10 and l06
enrolled, l12's facings labelled), the l06 package and l09 view are replaced,
and every stock.csv defect named there is corrected.
The OCR cost figure was re-measured rather than assumed: 18.0 ms/crop on 40
production-shaped crops, inside the recorded 18-26 ms band.